
On the Critical Path
On the Critical Path
orologio On the Critical Path en CB01 OFFICIAL. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
- Genere: Documentario
- Nazione: Canada
- Direttore:
- Cast:

Tags: #On the Critical Path 1971 #On the Critical Path CB01 OFFICIAL # vedere On the Critical Path online gratis # On the Critical Path film completo hd # On the Critical Path CB01 OFFICIAL official # On the Critical Path film streaming # On the Critical Path 123movies # On the Critical Path fmovies # On the Critical Path in italiano #ONF | NFB #nuclear power #candu
Commento
Simile
- 1980

Developing Tomorrow’s Energy
Developing Tomorrow’s Energy01980HD
![Developing Tomorrow’s Energy]()
- 2013

Uranium Drive-In
Uranium Drive-In02013HD
![Uranium Drive-In]()
- 2017

The New Fire
The New Fire02017HD
![The New Fire]()
- 2019

월성
월성02019HD
![월성]()
- 1969

Douglas Point Nuclear Power Station: Design and Construction
Douglas Point Nuclear Power Station: Design and Construction01969HD
![Douglas Point Nuclear Power Station: Design and Construction]()
- 2019

L'atomo: una storia d'amore
L'atomo: una storia d'amore6.42019HD
![L'atomo: una storia d'amore]()
- 1963

Nuclear Power Demonstration
Nuclear Power Demonstration01963HD
![Nuclear Power Demonstration]()
- 1973

This Nuclear Age
This Nuclear Age01973HD
![This Nuclear Age]()
- 1971

On Power Refuelling
On Power Refuelling71971HD
![On Power Refuelling]()
- 1968

Douglas Point Nuclear Power Station
Douglas Point Nuclear Power Station01968HD
![Douglas Point Nuclear Power Station]()
- 1973

Nuclear Power Reactor - Pickering
Nuclear Power Reactor - Pickering01973HD
![Nuclear Power Reactor - Pickering]()
- 1975

Power from the Atom
Power from the Atom01975HD
![Power from the Atom]()




